FROM THE BLOG

Company News

Preparation work before organic manure production

2021/02/01

The equipment of organic fertilizer production line can be used for the process of organic wastes such as livestock manure, sludge waste, filter sludge of sugar factory, dregs cake and straw sawdust. It is widely used in fermentation and moisture removal in organic fertilizer plants, compound fertilizer plants, sludge waste plants, horticultural fields and Agaricus bisporus planting plants.

Preparation work before organic manure production
 
Preparation work before using the organic manure production:

1. Build two 1.5-1.8m high, unlimited length, 2-10M between the two walls.

2. Set light track on the wall.

3. The track is equipped with self-propelled tilting machine which can move forward and backward, left and right, up and down.

4. Production of organic fertilizer: mixing livestock and poultry manure with microbial fermentation agent or fermented old materials, turning the materials in the tank once a day with a speed of 2-5M / min, which plays the role of oxygen and material. Fresh animal manure enters the tank from one side and moves to the other side of the tank continuously by the flipper to form decomposed organic fertilizer. It takes about 7 days in summer and 15 days in winter.

There are two steps to process commercial organic fertilizer in the organic fertilizer production line: early fermentation and treatment part and deep processing granulation part. Organic fertilizer equipment needs fermentation compost windrow turner, crusher, mixer, organic fertilizer granulator, dryer, cooler, screening machine, coating machine, packaging machine, conveyor and other equipment.