Installation, commissioning and operation of half-wet material crusher

2023/10/23

Half-wet material crusher installation and commissioning:

1. The organic fertilizer equipment should be installed on a horizontal concrete foundation and fixed with foot bolts.

2, installation should pay attention to the main body and horizontal vertical.

3. Check whether the bolts are loose after installation, and tighten them if they are loose.

4. Configure the power cord and control switch according to the power of the equipment.

5, the inspection is completed, the empty load test, the test can be normal production.

Operation precautions

1, the bearing each shift to play a lubricating oil, and regularly replace the new lubricating oil, the replacement of the bearing to wash. The lubricating oil injected must be clean and well sealed.

2, the newly installed tire is easy to loose often check.

3, pay attention to check whether the work of each part of the organic fertilizer production line machine is normal.

4. Pay attention to check the wear degree of easily worn parts, and pay attention to replacing worn parts at any time.

5, bearing oil temperature rise, should immediately stop to check the cause to be eliminated.